Legacy Elementary Water and Sewer SystemsThe new Legacy Elementary school off-site utility project, included a Preliminary Engineering Study to evaluate the best alternatives to service the new school with water and sewer services as well as fire suppression supply water. PR&A assisted MCPS to acquire needed utility easements from land owners and agreements with the City of Belleview. PR&A performed all project management, engineering design, surveying, permitting with FDEP, and preparation of construction documents. The project included a duplex sewage pump station and 2,600LF of 4-inch forcemain, Gravity sewer, over 3,200 LF of 8-inch and 12-inch water distribution main and appurtenances.
The new Legacy Elementary school off-site utility project, included a Preliminary Engineering Study to evaluate the best alternatives to service the new school with water and sewer services as well as fire suppression supply water. PR&A assisted MCPS to acquire needed utility easements from land owners and agreements with the City of Belleview. PR&A performed all project management, engineering design, surveying, permitting with FDEP, and preparation of construction documents. The project included a duplex sewage pump station and 2,600LF of 4-inch forcemain, Gravity sewer, over 3,200 LF of 8-inch and 12-inch water distribution main and appurtenances.