Silver Springs Shores Unit 26PR&A provided both Engineering and Surveying Services to the Marion County Clean Water Program for stormwater management system improvements to reduce and address localized flooding in the Silver Springs Shores Unit 26 Subdivision. Specifically, the project involved designing two additional drainage retention areas, expansion of two previously constructed drainage retention areas, improvement of the existing stormwater conveyance systems (including the design of new stormwater piping systems) and discharge structures. The project also included assisting the County with a formal request for two upland easements from the Division of State Lands.
PR&A provided both Engineering and Surveying Services to the Marion County Clean Water Program for stormwater management system improvements to reduce and address localized flooding in the Silver Springs Shores Unit 26 Subdivision. Specifically, the project involved designing two additional drainage retention areas, expansion of two previously constructed drainage retention areas, improvement of the existing stormwater conveyance systems (including the design of new stormwater piping systems) and discharge structures. The project also included assisting the County with a formal request for two upland easements from the Division of State Lands.