Alachua County CR 172 Milling and Resurfacing

The 3.5 mile urban roadway project included the development of a Supplemental Traffic Control Plans through the CR 172 work zone phases. The Roadway Constructions Plans included some realignment of the existing roadway, addition of turn lanes, and the reconfiguration of roadway medians as well as pedestrian and bicycle facilities. The existing roadway was a semi-urban section with multiple side streets and school crossings. Residential access was maintained at all times. The project was completed in a very tight timeframe to meet the schedule of completion of the construction before the beginning of the school year.