Muclan Farms Bridge

PR&A has provided Engineering and Surveying services for The Refuge on several projects over the last five years including a new bridge over the Ocklawaha River. This project included removal of an older Bailey bridge by the SJRWMD and construction of a new 180 foot single span steel structure bridge. We also hired industrial painting services to apply a 2 hour intumescent paint for steel that provides a more resistant layer of protection from rust, corrosion, extreme weather, fire, and other damaging elements.

PR&A performed all civil engineering, surveying, design & permitting services for this project including coordination and permitting with SJRWMD, FDEP, ACOE, US Coast Guard, and Marion County. They also worked with https://industrialcoatingservices.uk/ to ensure a hard and durable finish. Construction administration services we also called in for site inspections, Regulatory Agency coordination, site surveys and As-builts.