Zellwood Station Pond and Pump Station

This project included construction of a  2.5  acre HDPE Lined Holding pond with  2.44 MG  gallons of lined storage capacity. The water pumping facility is a 2.6 MGD station with three vertical turbine pumps and all associated electrical controls and equipment. The pumping station equipment was enclosed in a designed pump house to match the Co-op architectural standards and low maintenance requirements.   In addition to the new facilities, the design included reconstruction and modification to the existing irrigation supply well pumping equipment and  designing a modification to the vertical turbine pump and well head to use as a back-up and alternate water supply and supplement to the reclaimed water supply.